← Back to Blog

Real Estate Tips & Project Management · 01 March 2025

Bill of Quantities (BOQ): The Safety Document That Protects You from "Hidden Costs" During Finishing

Bill of Quantities (BOQ): The Safety Document That Protects You from "Hidden Costs" During Finishing

The biggest nightmare facing anyone about to build or finish their home is the phrase: "The budget is finished and the work is not done yet." We often hear about projects that stopped in the middle, or disputes between the owner and contractor due to phrases like "This was not included in the price" or "I meant a different type."

The secret to avoiding all these disasters lies in one engineering document that we consider at True Draft the constitution of work: the Bill of Quantities and Specifications (BOQ).

In this article, we reveal to you why you should not pay a single riyal before receiving this document.

What is a Bill of Quantities (BOQ) Simply?

It's not just an ordinary pricing sheet. It's a detailed and comprehensive breakdown of every nail that will be used in your project. The BOQ specifies:

  • Quantity: How many square meters of ceramic? How many electrical points exactly?
  • Description: What type of paint? What is the manufacturer's name? How many layers of putty?
  • Measurement Method: Do we calculate by square meter or by piece?

Why is BOQ the Most Important Document in Your Project?

1. Unifying the "Ruler" When Comparing

When you send your home plan to 3 contractors without a bill of quantities:

  • Contractor (A) will give you a cheap price (because they calculated with commercial materials).
  • Contractor (B) will give you a medium price.
  • Contractor (C) will give you a high price (because they calculated with original materials and high specifications).

You will choose the cheapest thinking you saved, but in reality, you bought lower quality. With a bill of quantities: everyone prices the same item and the same material, and here real and transparent competition appears.

2. Eliminating "Hidden Expenses"

In random contracts, the contractor surprises you with additional requests in the middle of work: "The price only included the foundation, installing outlets is calculated separately!". The bill of quantities closes this door completely. Every item has its price mentioned, and what is not mentioned is agreed upon with a clear addendum. You know the final cost accurately before the hammer strikes the ground.

3. Quality Assurance (Strict Control)

When it's written in the table: "Supply and installation of Spanish first-class porcelain, laser cut, size 60x120". The executor cannot bring Chinese or Indian porcelain and say "it's all porcelain". The table is the decisive judge that ensures you will get exactly what you paid for.

A Mistake Many Fall Into: The Deceptive "Price Per Meter"

Beware of the contractor who gives you a quick price over the phone: "I'll finish your apartment at a price of … per meter". Finishing is not fabric sold by the meter! The price per meter depends on hundreds of details: Are the doors solid wood or filled? Are the paints Jotun or commercial type? Is the AC concealed or split? At True Draft, we reject the principle of random "unified price per meter" and rely on detailed pricing based on a bill of quantities that reflects your real desires.

How We Work at True Draft?

We believe that "clarity of beginnings ensures quality of endings."

  • We sit with you to understand your needs and budget.
  • We prepare a detailed bill of quantities (BOQ) that clarifies every material that will be used.
  • We present you with a price quote based on this table, so you can be assured that the price is final and quality is guaranteed.

Conclusion

The bill of quantities is not a luxury or "engineering complexity", but rather your only means to protect your money and ensure receiving your home with the quality you dream of without unpleasant surprises. Don't start without it.